Signal Timing Along The City Of Pasadena's Main Corridors

CityOfPasadena 

Street Smarts created, installed and fine-tuned timing plans for major corridors, established emergency vehicle preemption, and assisted the City Traffic Engineer solve additional signal timing and signal design issues.

Timing plans were developed for nearly 90 intersections based on travel time between intersections and offsets at crossing systems to meet the strict limited project budget. The majority of the timing plan development was based on field experience and field observations.

Timing parameters were established and deployed at 24 intersections for expansion of the City's emergency vehicle preemption system.

The City Traffic Engineer consults with Street Smarts engineers on an as needed basis for expertise in signal design and timing issues.


Regulatory, Warning, and Directional Sign Upgrades

Street Smarts inventoried over 6,800 signs on the airport property and created plans for regulatory, warning, and directional sign upgrades. The sign inventory was utilized to evaluate each sign's location, significance, and condition to identify those signs to be included in the replacement plan set. New regulatory signs were designed for Airport specific uses when standard MUTCD signs could not be used. Street Smarts' engineers will also assist with the construction management.


Metro-Atlanta Signal Upgrade And Communication Project

Signal Controller Box 

As part of the Governor's Fast Forward Program, Street Smarts was selected to participate in the upgrading of existing state and local signal systems, including more than 400 traffic signals in the metropolitan Atlanta area. The project seeks to modernize and repair aging equipment on Metro-Atlanta's regionally significant corridors.


Texas Department Of Transportation Dallas District Signal Timing

TxDOT  

Signal system timing plans along State Highways in the Cities of Rockwall and Midlothian, Texas.

Street Smarts developed timing plans for FM 740 and SH 205 in the City of Rockwall, and US 287 in the City of Midlothian for this project. Traffic patterns were analyzed to identify operational plans; timing parameters were developed; and the signal system was modeled with the planned timing improvements.

Street Smarts engineers conducted field fine-tuning of the new timing plans and coordinated travel time data collection. Before and after studies were conducted to document the reduction in travel time, number of stops and signal delay along all corridors.


Suwanee Jubilee and Suwanee Station Signal Warrant Study

Suwanee Station Closeup  Suwanee Station Intersection

Street Smarts performed a traffic signal warrant study for the intersection of Peachtree Industrial Boulevard at Station Center Boulevard/Vista Point Lane in Suwanee, Gwinnett County, Georgia. Developments currently under construction will eventually include a 82,215 square foot shopping center, 118,735 square feet of specialty retail, 487,730 square feet of office space, 668 apartments, 310 townhouses, and 112 single-family homes. As part of the study, the existing traffic at the intersection was counted and estimates made regarding future traffic volumes after build out of the area.


Scott Boulevard Signal Timing
Decatur, Georgia

ScottBoulevard01  ScottBoulevard02

ScottBoulevard03 

Street Smarts developed and implemented new signal timings for Scott Boulevard in accordance with GDOT Specifications. The five-mile, 12-intersection corridor is a major commuter artery through the heart of DeKalb County with several major arterial crossings. The results of the signal timing project and communication repairs were improvements to every measure of effectiveness - travel time, speed, overall delay, number of stops, fuel consumption, and emissions. The average total delay decreased 42%.